Publication date
Body
Hero image
Image

Toll has moved their Clayton operations into a brand new developed facility located in Braeside Industrial Estate.

The new modern facility, located in the central logistics hub, is only four kilometres from the Dandenong Bypass and provides a strategic linehaul staging hub for South East Melbourne customers.

“Our new Braeside facility has over 35% more under roof space allowing us to continue to grow and meet the future needs of our customers supported by our 35-strong team.

“This facility has also been designed to meet the 5-star Green Start rating helping to reduce our impact on the environment”. Executive General Manager Palletised Express, Kris Talevski commented.

The site features:

  • Energy-efficient LED high bay lighting to warehouse and LED lighting to office areas, including light/motion sensors and control system 
  • Energy and water metering and monitoring 
  • Rainwater storage tank connected to a landscape irrigation system and main office amenities for WC flushing 
  • The ability to draw from the 100kW solar PV system to be shared among tenants saving approximately 6kWh/sqm. 

It also includes:

  • B Double access 
  • 32m wide propped awning and 15m wide cantilevered awning above on-grade doors and recessed container docks with levellers
  • 450m2 modern office space. 
Syndicated Content
Toll has moved their Clayton operations into a brand new developed facility located in Braeside Industrial Estate.The new modern facility,
Toll moves to new facility at Braeside central logistics hub
Syndicated Image
Image
News type
Tags
Display secondary navigation
Off